Landfill Gas and Digester Gas Experience Utilizing Waukesha Reciprocating Engines
Client State Application Curtis Engine & Equipment
Operating Experience
Comments
Prince George's County Landfill, Phase I MD Landfill Gas Equipment specification, installation, and ongoing maintenance 3 x 825kw Engine generators and County Correctional Facility boilers in place since 1987
Prince George's County Landfill, Phase II MD Landfill Gas Equipment specification, installation, and ongoing maintenance. 4 x 1100kw Engine generators in place since April 2003.
City of Harrisburg Waste Water Treatment Plant PA Digester Gas Equipment maintenance for 15 years. 2 x 400kw Engine generator sets in place since 1985.
Peppers Ferry Regional Waste Water Treatment Plant VA Digester Gas Equipment installation plus early stage maintenance. Mechanical drive engine in place since 1985.
Metropolitan Sewer District NC Tri-fuel (Landfill Gas + Digester Gas + Natural Gas) Equipment maintenance for 10+ years. 2 x 600kw Engine generator sets in place for more than 10 years.
Orange Water & Sewer Authority NC Dual-fuel (Digester Gas + Natural Gas) Equipment maintenance for 10+ years. Mechanical drive engine. Originally, digester gas only.
Oakwood Gathering VA Coal Bed Methane Equipment specification, installation & early-stage maintenance. Multiple engines in mechanical drive and generator configurations.
City of Roanoke VA Digester Gas Major equipment overhauls, technical support, parts supply. 7 x L3711 Mechanical drive engines in place for more than 20 years.
City of Durham NC Digester Gas Technical support & parts supply for 10 years. Mechanical drive.
Bethel Landfill VA Landfill Gas Technical support 1 x 150kw Engine generator set
Fauquier County Landfill/ Curtis Operating Experience VA Landfill Gas Participated in the design, and now operate and maintain the facility. 2 x 1000kw Engine generator sets.
Eastern Landfill MD Landfill Gas Participated in the design and will operate and maintain upon completion. 3 x 1000kw Engine Generator Sets.
Completion scheduled 06/06.